top of page

General Discussions

Public·226 members

End PSR

The Sheet Metal, Air, Rail Transportation Union (SMART) is calling for an end to the business practice of Precision Scheduled Railroading (PSR). SMART Transportation Division President Jeremy Ferguson is calling for the United States Department of Transportation and the Federal Railroad Administration to implement a series of regulations with the aim of ending PSR which is the predominant business practice in the freight rail industry.

According to Ferguson:

“Due to Precision Scheduled Railroading (PSR), trains are much longer than they used to be, with some now over four miles in length. Even as the trains have gotten longer, the workforce supporting them has gotten smaller. All of this is done by rail corporations in pursuit of lower operating costs, higher profits, and a better return for shareholders. Bottom line: their deference to operating ratios over safety conditions has led us to the point where fewer railroaders with less training are taking longer trains made up of more hazardous materials down tracks with more wear and tear,” Ferguson said. “As the heartbreaking images from East Palestine show, this is a recipe for more catastrophic consequences. Unfortunately, PSR will not be a trend that runs its course and comes to an end naturally. As long as it is more profitable to clean up a disaster than to prevent one, these Wall Street-driven rail corporations will continue to hold communities like East Palestine, Ohio hostage. We must take action to end PSR now.”

PSR, which has proliferated industry-wide amongst the nation’s Class 1 freight railroads, is highlighted by an emphasis on reducing staffing and maximizing profits. In the wake of this trend, our nation’s rail carriers have famously reduced their head counts, lengthened trains, and relaxed safety inspections on locomotives, rolling stock (rail cars) and tracks alike. All of this has been done in the name of reducing the only metric valued by PSR: operating ratio. In the name of improved operating ratios, the car departments and track maintenance departments have been ordered to do more with less. Reduced staffing levels and the increased number of cars per train have made it impossible for these railroad professionals to properly inspect equipment to ensure its safety. As an example, car inspections that used to be done with an industry standard of 3-4 minutes per car have been reduced to 60-90 seconds.

“Norfolk Southern’s financial liability for the derailment in East Palestine is being projected by experts to amount to 1.7 percent of their net profit from 2022. It is being said that the company’s bottom line and stock price will have fully recovered by May of this year,” Ferguson continued. “How long will it take the families impacted by this disaster to recover? It is time for the federal government to step in and levy significant penalties on these companies until they feel the same level of pain as we saw in the makeshift shelters of East Palestine. This, and only this will refocus the shareholders and executives of these companies on the safety of SMART’s members and the American public.”

https://smart-union.org/smart-union-renews-call-for-rail-industry-changes-after-ohio-derailment/

52 Views
bottom of page